746: 18th World Sudoku Championship 2025

 

 

 

270 Participants  35 Countries

14 Rounds (10 Individual + 4 Team Rounds)

140 Grids and 88 variants

 

7200 Points at stake for team round

and

4200 points for individual rounds

 

ALL THE BEST TEAM INDIA

IND Sahith Malepati UN
IND Swathi Reddy Mogiligundla Q
IND Nityant Agarwal B
IND Tigran Wadia B
IND Tushar Maheshwari B
IND Swaroop Guggilam B
IND Kartik Reddy A
IND Jaipal Reddy M A
IND Prasanna Seshadri A
IND Hemant Malani A

 

ROUND 01 Road to Eger!
Individual round 30 minutes 300 points

 

Shifted Sudoku 50 points
Pinocchio Sudoku 30 points
Pyramid Sudoku 30 points
Surplus Sudoku 50 points
Cube Sudoku 35 points
Mirror Sudoku 20 points
Coded Sudoku 40 points
Greater then Sudoku 35 points
0-9 Kropki Sudoku 65 points
Thermo Sudoku 30 points
Killer Sudoku 35 points
Parity Lines Sudoku 45 points
Shape Sudoku 60 points

 

ROUND 02 Classic Sprint
Individual round 20 minutes 200 points

 

Classic Sudoku             10 points 10 points 15 points
  15 points 15 points 15 points
15 points 20 points 20 points
20 points 20 points 25 points

 

ROUND 03 Parity Party
Individual round 40 minutes 400 points

 

1. Even / Odd Sudoku 20 points
2. Even / Odd Sudoku 20 points
3. Different Parity Sudoku 40 points
4. Different Parity Sudoku 65 points
5. Tic-tac-toe Sudoku 25 points
6. Battenburg Sudoku 30 points
7. First Even / Odd Sudoku 40 points
8. First Even / Odd Sudoku 55 points
9. Even Sandwich Sudoku 45 points
10. Odd Labyrinth Sudoku 60 points

 

ROUND 04 Halved Squares
Individual round 50 minutes 500 points
  1. Halved Squares Sudoku 30 points
  2. Halved Squares Sudoku 45 points
  3. HS Outside Sudoku 35 points
  4. HS Outside Sudoku 85 points
  5. HS Thermo Sudoku 20 points
  6. HS Thermo Sudoku 80 points
  7. HS Killer Sudoku 60 points
  8. HS Killer Sudoku 145 points

 

ROUND 05 Small World
Individual round 40 minutes 390 points

Search 6      – Irregular                              25 + 25 points

Thermo – Arrow                                          25 + 25 points

Kropki Pairs       – Clock                             25 + 25 points

Deficit                 – Surplus                          25 + 25 points

Clone   – Same                                              25 + 25 points

Neighbours                                                    25 + 25 points

Diagonally NC – Palindrome                15 + 15 points

Extra  Irregular Sudoku                         15 + 15 points 

 

ROUND 06 Calculated Fun
Individual round 45 minutes 450 points
  1. Killer Sudoku 35 points
  2. Arrow 0-8 Sudoku 70 points
  3. Before Nine Sudoku 45 points
  4. Upper Right Heavy Killer Sudoku 70 points
  5. Same Sum Sudoku 70 points
  6. Same Product Sudoku 35 points
  7. Multiplication Table Sudoku 35 points
  8. Dot Sum Sudoku 90 points

 

ROUND 07 Spot One!
Individual round 50 minutes 400 points
  1. Spot One Sudoku 80 points
  2. Spot One Sudoku 80 points
  3. Spot One Sudoku 80 points
  4. Spot One Sudoku 80 points
  5. Spot One Sudoku 80 points

 

ROUND 08 Circle of Sudoku
Team round 45 minutes 1800 points
  1. Renban Sudoku 180 points
  2. Anti-XV Group Sudoku 180 points
  3. Fortress Sudoku 180 points
  4. All even / all odd Sudoku 180 points
  5. Classic Sudoku 180 points
  6. Classic Sudoku 180 points
  7. All even / all odd Sudoku 180 points
  8. Fortress Sudoku 180 points
  9. Anti-XV Group Sudoku 180 points
  10. Renban Sudoku 180 points

 

ROUND 09 The Patchwork Challenge
 Team round 45 minutes  1800 points

 1-9.      Patchwork Sudoku                  200 points each

 

ROUND 10 Classic Uphill
Individual round 40 minutes 400 points

 

Classic Sudoku             25 points 25 points 25 points
25 points 30 points 30 points
30 points 35 points 35 points
40 points 45 points 55 points

 

ROUND 12 Sudoku Mix
Individual round 80 minutes 800 points
  1. Outside 234 Sudoku 80 points
  2. Classic Sudoku 30 points
  3. Diagonal Sudoku 45 points
  4. Relation Even / Odd Sudoku 15 points
  5. Rossini Sudoku 45 points
  6. Shape Sudoku 30 points
  7. Battenburg Sudoku 30 points
  8. Sequences Sudoku 40 points
  9. Tile Sudoku 30 points
  10. Ten Box Sudoku 45 points
  11. Termination Sudoku 85 points
  12. Sudokuro 55 points
  13. Self-Joint Sudoku 20 points
  14. Pole Position Sudoku 35 points
  15. Fraction Sudoku 65 points
  16. Sequence Top-bottom Sudoku 55 points
  17. Plus-Minus Sudoku 45 points
  18. Coded Pointing Evens Sudoku 50 points

 

ROUND 13 Weakest Link Revised
Team round 45 minutes 1800 points

 

01-04. Irregular Sudoku 4 * 75 points
05-08. Killer Sudoku 4 * 75 points
09-12. Next to Nine Sudoku 4 * 75 points
13-16. Difference Sudoku 4 * 75 points
17-20. Distance Sudoku 4 * 75 points
21-24. Outside Sudoku 4 * 75 points

 

ROUND 14 Utter Chaos
Team round 45 minutes 1800 points

Bottom layer                            4 * 275 points

Middle layer                             4 * 125 points

Top layer                                  4 * 50 points

 

MENTALLY EXHAUSTING SCHEDULE AND LINE UP OF SUDOKUS

 

1977
Default rating

Please give a thumbs up if you  like The Post?

 

For regular updates, please register your email here:-

Subscribe

 

 

References and credits

To all the online sites and channels.

Pics Courtesy: Internet

Disclaimer:

Information and data included in the blog are for educational & non-commercial purposes only and have been carefully adapted, excerpted, or edited from reliable and accurate sources. All copyrighted material belongs to respective owners and is provided only for wider dissemination.

 

744: Discussion with Parikshit Luthra on CNBC about DPM 2025

 

Had an interesting discussion on Repercussions of DPM 2025 on OP Preparedness

 

 

Value Additions are most Welcome

 

1977
Default rating

Please give a thumbs up if you  like The Post?

 

For regular updates, please register your email here:-

Subscribe

 

 

References and credits

To all the online sites and channels.

Pics Courtesy: Internet

Disclaimer:

Information and data included in the blog are for educational & non-commercial purposes only and have been carefully adapted, excerpted, or edited from reliable and accurate sources. All copyrighted material belongs to respective owners and is provided only for wider dissemination.

 

743: CHINA WITHDRAWAL FROM PAKISTAN’S CPEC (ML-1 PROJECT): A GEOPOLITICAL SHIFT

 

Article published on the REVA University Website on 15 Sep 25.

 

The China-Pakistan Economic Corridor (CPEC) is one of the China Belt and Road Initiative (BRI) crown jewels, which China intends to connect Xinjiang with Pakistan’s Gwadar Port through a 3,000-kilometer highway-pipeline-railway network. Worth over $60 billion, CPEC has assured Pakistan with revolutionary infrastructure. At the heart of it was the $6.7 billion Main Line-1 (ML-1) rail project, which was meant to modernise the 1,726-kilometer Karachi-Peshawar railway line. But China’s recent withdrawal from funding this “crown jewel” of CPEC has forced Pakistan to seek an Asian Development Bank (ADB) loan of $2 billion for the Karachi-Rohri section, a dramatic departure from China’s dominating hold on Pakistan’s infrastructure.

 

The ML-1 Project and Its Setbacks

The ML-1 railway was to upgrade the old rail infrastructure of Pakistan, doubling track, signalling upgrade, and increasing train speed to 165 km/h from 80 km/h, increasing capacity to 34 from more than 150 trains per day. This was needed to transport copper and gold from the Reko Diq mine in Balochistan, a priority project being developed by Barrick Gold. The success of the mine is reliant on solid logistics, which the existing railway is not capable of delivering.

China initially made a concessionary loan offer of 85% of the project’s cost, but talks fell through for nearly a decade. Costs fluctuated between $6.8 billion and $9.85 billion before eventually settling at $6.7 billion, capturing financial imponderables. Pakistan’s arrears of $1.5 billion to Chinese power producers and its requirement of an IMF bailout also caused concern. Security issues, including the killing of 21 Chinese nationals since 2021, were also a cause of Beijing’s suspicion.

 

Why China Pulled Back

China’s retreat is triggered by Pakistan’s economic weakness and security issues. Haroon Sharif of the Pakistan Regional Economic Forum went on to state that China revalued ML-1’s finances and Pakistan’s payment issues and determined the risks were too high. China’s foreign lending strategy is also transforming under the pressure of domestic economic constraints, reducing its appetite for foreign high-risk projects. CPEC power plant payments due for deferment, planned to relieve Pakistan’s energy crisis, have put a strain on confidence.

Geopolitically, China’s approach is shifting. Foreign Minister Wang Yi, on Aug. 21, 2025, signalled a readiness to allow third-party involvement in CPEC, in contrast to Beijing’s earlier sole-financing policy. This suggests that China would prefer to have Pakistan utilise foreign lenders like the ADB, limiting its exposure while maintaining strategic connections in place. Despite this, China reasserted its “ironclad” alliance with Pakistan, with emphasis on cooperation in sectors other than infrastructure.

 

Pakistan’s Turn to the ADB

With China exiting, Pakistan sought a $2 bilion loan from the ADB to upgrade the 480-kilometer Karachi-Rohri section. The ADB, after surveying the site in July 2025, consented in principle to fund it, the very first time that a priority CPEC project will rely on a multilateral lender. Unlike China’s low-interest loans, the ADB’s market-rate funding may contribute to Pakistan’s debt overhang. The initiative also comprises competitive bidding, introducing transparency but putting Pakistan’s project management abilities to the test.

ADB’s role does not end at ML-1, with $410 million for infrastructure pertaining to Reko Diq. A high government official predicted a “crisis” in the absence of ML-1 upgradation, since the current railway will not be able to carry the mine cargo, crucial for Pakistan’s export strategy.

 

Geopolitical and Economic Implications

CPEC has been delayed since its inception in 2015. Initial steam, like the Gwadar East Bay Expressway, was arrested by Pakistan’s economic troubles, security issues, and bureaucratic delays. The Prime Minister Shehbaz Sharif’s visit to China in 2025 secured $8.5 billion of non-infrastructure contracts but highlighted coordination gaps with his unilateral “CPEC 2.0” announcement.

Pakistani dependence on external finance—IMF, the Gulf states, and now the ADB—is its weakness. In the absence of reform, new loans risk making the debt trap irreversible. Indian objections to CPEC passing through contested Kashmir and global doubts over Pakistani finance create additional layers of complexity.

 

Conclusion

China’s retreat from the situation at the ML-1 project is an inflexion point for CPEC. For Pakistan, its approach towards the ADB is a necessity and also part of a wider shift towards multilateral financing. The necessity for loans from lenders like ADB, IDB and others may diversify its funding base, but ultimately, Pakistan will still require foreign bailouts in the future. Pakistan now has the prospect of a risky path that requires it to bridge its strategy with China, the U.S., and global lenders. Success with ML-1 and Reko Diq and other projects will depend on whether Pakistan can manage its debt, create security, and implement infrastructure to catalyse economic potential. Pakistan’s diplomacy now is less centred on China and it’s more a matter of global integration. However, this is not guaranteed.

 

Please Add Value to the write-up with your views on the subject.

 

1977
Default rating

Please give a thumbs up if you  like The Post?

 

For regular updates, please register your email here:-

Subscribe

 

 

References and credits

To all the online sites and channels.

Pics Courtesy: Internet

Disclaimer:

Information and data included in the blog are for educational & non-commercial purposes only and have been carefully adapted, excerpted, or edited from reliable and accurate sources. All copyrighted material belongs to respective owners and is provided only for wider dissemination.

 

English हिंदी